From Vision to Reality
Where Great Work Gets Done
Delano
Highlights
Installed underground conduit, overhead power lines, and interconnecting AC/DC wiring.
Managed transformer connections and completed utility terminations.
Type: Commercial Solar Energy
El Segundo
California
Highlights
Coordinated system placement to support efficient power distribution and storage.
Installed a solar photovoltaic (PV) carport system across a garage structure and adjacent rooftop.
Integrated a battery storage system connected to the existing electrical network.
Type: Commercial Solar Energy / Battery Storage
Kern County
Highlights
Installed a ground-mount solar system in Kern County featuring a 2PACK configuration (AC 5000KW / DC 7000KW).
Demonstrated advanced planning and execution to support efficient renewable energy infrastructure.
Type: Commercial Solar Energy
Wasco
Highlights
Completed a 4.9-MW solar installation in Wasco over nine months with more than 12,000 labor hours.
Installed underground feeders, conduit, inverter and combiner racks, and completed full AC/DC terminations.
Built communications and infrastructure systems including fiber, Cat-6, RS-485, grounding, transformers, and commissioning.
Type: Commercial Solar Energy
Visalia
Highlights
Completed a 4.2-MW solar field installation supporting 5,567 photovoltaic modules and 14 inverters.
Installed major electrical infrastructure including 4000A disconnects and 2500kVA/2500kW transformers.
Integrated supporting systems including BESS, DAS, fiber communications, and overhead power lines.
Type: Commercial Solar Energy / Battery Storage
North Midway Sunset
California - Completed in August 2016
Highlights
Constructed a 2.5-mile (4.2 km) 115kV pole line connecting two substations.
Included a major crossing over State Highway 33.
Type: Overhead High Voltage
San Jose
California - Completed in April 2022
Highlights
Installed two 21kV solar transmission lines totaling approximately 4 miles of distribution.
Constructed the system using wood and steel poles, including direct-embedded tangents, guyed angles, and steel dead-end structures on concrete piers.
Type: Overhead High Voltage
Arvin
California - Completed in January 2024
Highlights
Upgrades and expansion including testing 53 existing poles.
Constructed five new spans of 4160V OHPL and replaced two poles using helicopter-assisted installation.
Type: Overhead High Voltage
Visalia
California - Completed in 2025
Highlights
Upgrades and expansion including testing 53 existing poles.
Constructed five new spans of 4160V OHPL and replaced two poles using helicopter-assisted installation.
Type: Overhead High Voltage / Fiber Install
Bakersfield
California - Completed in January 2023
Highlights
Removed and disposed of existing substation components before installing new equipment.
Replaced key infrastructure including power lines, insulators, field switches, and the facility’s battery room system.
Type: Substation Refurberation
Kern County
California - Completed in July 2016
Highlights
Installed 12kV overhead power lines to supply a new powerhouse across multiple facility locations.
Provided secondary distribution to motors and completed associated instrumentation and control systems.
Type: Upstream Oil & Gas