Where Great Work Gets Done

r.i.m. (13)
Highlights

Installed underground conduit, overhead power lines, and interconnecting AC/DC wiring.

Managed transformer connections and completed utility terminations.

Type: Commercial Solar Energy

r.i.m. (14)
Highlights

Coordinated system placement to support efficient power distribution and storage.

Installed a solar photovoltaic (PV) carport system across a garage structure and adjacent rooftop.

Integrated a battery storage system connected to the existing electrical network.

Type: Commercial Solar Energy / Battery Storage

r.i.m. (15)
Highlights

Installed a ground-mount solar system in Kern County featuring a 2PACK configuration (AC 5000KW / DC 7000KW).

Demonstrated advanced planning and execution to support efficient renewable energy infrastructure.

Type: Commercial Solar Energy

84
Highlights

Completed a 4.9-MW solar installation in Wasco over nine months with more than 12,000 labor hours.

Installed underground feeders, conduit, inverter and combiner racks, and completed full AC/DC terminations.

Built communications and infrastructure systems including fiber, Cat-6, RS-485, grounding, transformers, and commissioning.

Type: Commercial Solar Energy

r.i.m. (16)
Highlights

Completed a 4.2-MW solar field installation supporting 5,567 photovoltaic modules and 14 inverters.

Installed major electrical infrastructure including 4000A disconnects and 2500kVA/2500kW transformers.

Integrated supporting systems including BESS, DAS, fiber communications, and overhead power lines.

Type: Commercial Solar Energy / Battery Storage

r.i.m. (2)
Highlights

Constructed a 2.5-mile (4.2 km) 115kV pole line connecting two substations.

Included a major crossing over State Highway 33.

Type: Overhead High Voltage

r.i.m. (3)
Highlights

Installed two 21kV solar transmission lines totaling approximately 4 miles of distribution.

Constructed the system using wood and steel poles, including direct-embedded tangents, guyed angles, and steel dead-end structures on concrete piers.

Type: Overhead High Voltage

r.i.m. (4)
Highlights

Upgrades and expansion including testing 53 existing poles.

Constructed five new spans of 4160V OHPL and replaced two poles using helicopter-assisted installation.

Type: Overhead High Voltage

93
Highlights

Upgrades and expansion including testing 53 existing poles.

Constructed five new spans of 4160V OHPL and replaced two poles using helicopter-assisted installation.

Type: Overhead High Voltage / Fiber Install

r.i.m. (5)
Highlights

Removed and disposed of existing substation components before installing new equipment.

Replaced key infrastructure including power lines, insulators, field switches, and the facility’s battery room system.

Type: Substation Refurberation 

96
Highlights

Installed 12kV overhead power lines to supply a new powerhouse across multiple facility locations.

Provided secondary distribution to motors and completed associated instrumentation and control systems.

Type: Upstream Oil & Gas